close
For high-mix manufacturing teams

Cut changeover time on every shift.

SMED digital workflows so operators know the next step, sign-off is captured, and delays show up after every run.

  • Guided tasks per product pair
  • Live sync for the shift team
  • Gantt + sign-off on every run

7-day free trial · Need rollout help?

Step 1

Map the products you run and how they differ.

Define the specs that drive changeover work. ProChangeover builds the right task list for each product switch — without paper-sheet tribal knowledge.

Product specifications
SKU
Material
Temp (°C)
Mould
SKU-A100HDPE180#42
SKU-B200ABS220#78
SKU-C310PP195#42
SKU-D450Nylon240#91

Switching SKU-A100 → SKU-B200 generates 6 tasks automatically

Step 2

Operators see the next task — in order, on any device.

One shared live checklist per changeover. Specs, sequence, and completed steps visible to the whole team.

Changeover Tasks
0 / 5
SKU-A100 SKU-B200

1. Clean conveyor belt surface

2. Set temperature to 220 °C

3. Replace mould #42 with #78

4. Adjust pressure to 3.5 bar

5. Verify alignment markers

Step 3

See the Gantt. Find the delay. Fix the standard.

Every run produces a timestamped timeline. Spot long steps, update the standard, close the gap next time.

Timeline
100%
Cleaning
Settings
Tooling
Inspection
08:00
08:05
08:10
08:15
08:20
Belt
Nozzles
Temp
+4 min vs standard
Pressure
Speed
Mould swap
QC Check
Completed
Issue found
23 min total

One line. One week.

Start with your highest-frequency changeover. After one logged run and a timeline, you'll know if it fits.

1 One line Highest-frequency changeover
2 Live in a day Configure, invite, run
3 Gantt after run 1 Decide before you roll out

Pricing

One plan. Full platform.

No feature tiers. No hidden add-ons.

Operations Plan

Digital SMED changeovers.

7-day free trial
$49 /month

Per department.

  • Unlimited lines and changeovers
  • Tablet + desktop web app
  • Real-time sync for the shift team
  • Timestamped sign-off and run history
  • Gantt timeline for every completed run
Start now in 10 minutes

Cancel anytime. Contact us if needed.

After your first run

Run your first standardized changeover this week.

Set up in 10 minutes. Invite the team. First run gives you a Gantt and a baseline.

  • Timestamped sign-off

    Audit-ready from run one

  • Gantt of every task

    See where time was lost

  • A repeatable standard

    Not tied to who showed up

7-day free trial · Self-serve · No IT project

Before you go

Rolling out to a team? We can help.

Most teams are self-serve. Multi-line setup or internal buy-in? Talk to us.

Talk to us

Multi-line rollout?

Configuration session: products, tasks, and first line live before you hang up.

Building a business case?

We can help frame changeover time savings for plant or ops leadership.

Questions about fit?

High-mix discrete, F&B, plastics — happy to talk through yours.